DEENENTWURF · DRAFT · Sample for Mustermann Carpentry, not binding, no bookings possible. Built by Thomas Eichinger · peaksites.de. © Thomas Eichinger · Creator’s legal notice
Home › Projects

What has left our workshop

Fifteen jobs from the last few years, sorted by trade. For each piece you’ll find what wood it’s made of, what the actual task was and how long it took us. Even when the answer isn’t very exciting.

Kitchens

Custom kitchens

The biggest part of our work. A kitchen is rarely just a piece of furniture. It’s half a room, and the walls, floors and connections are usually not as straight as they look on the plan.

Kitchen with fronts made from reclaimed wood
Musterdorf

A kitchen from the family’s own barn

The beams came from the family’s old barn, which was torn down. Resawn, nails pulled, made into fronts. The owner wanted to keep the woodworm holes.

WoodOak, 200 years old
TaskFronts from reclaimed wood
Build time7 weeks, 2025
Kitchen island with wooden front
Musterdorf

Kitchen island in walnut

In an open living space, the kitchen shouldn’t look like a kitchen. Handleless fronts, appliances behind doors. The island is 3.20 meters long and came in by crane over the balcony.

WoodEuropean walnut
Task3.20 m island, handleless
Build time6 weeks, 2025
Single-run kitchen with light wooden fronts
Musterwinkl

Single-run kitchen for a granny flat

Two and a half meters of wall, and that was all there was. Fridge and dishwasher sit one above the other, and the worktop runs through without a break. The owner chose to do without wall cabinets, so instead there’s an open shelf in the same wood.

WoodAsh, oiled
Task2.60 m run, no wall cabinets
Build time3 weeks, 2024
Built-in cupboards

Cupboards that belong in the wall

They make sense anywhere a bought wardrobe leaves a gap. Under sloping ceilings, in alcoves, around doors and windows. Most customers are surprised how much extra storage a built-in gives them.

Built-in cupboard under the sloping roof
Musterdorfen

Cupboard under the sloping ceiling

No standard furniture fits under a slope. We measured the wall, cut every door individually and took the storage right into the last corner.

WoodAsh, white oiled
Task4.10 m built-in under a slope
Build time3 weeks, 2025
Walk-in wardrobe with open shelving
Musterprien

Walk-in wardrobe across two walls

A small room, fitted out completely. Pull-out trouser rails, drawers, and a light that comes on as soon as the door opens. The light maple keeps the room feeling open.

WoodMaple, felt back panels
TaskWhole room fitted out
Build time4 weeks, 2025
Wooden bookcase wall under the sloping roof
Mustergau

Bookcase wall with a doorway

The wall is 4.80 meters wide, with a door into the bedroom right in the middle. We ran the shelving around the door frame so there’s no visible joint. The lower compartments got doors, because that’s where the files were meant to go.

WoodOak, oiled
TaskShelving wall around a door
Build time4 weeks, 2024
Staircases

Stairs, new and renovated

A staircase is the part of a house that gets touched most. That’s why we talk about step height and tread depth first, and only then about looks. Renovating is often the more sensible option than building new.

Folded oak staircase
Musterdorf

Folded staircase in oak

The staircase carries itself through the folds, so it needs no stringer. Built in three parts, fitted in one day. Railing in black flat steel.

WoodSolid oak, 60 mm
TaskSelf-supporting, 14 steps
Build time5 weeks, 2024
Renovated wooden staircase in a farmhouse
Musterdorf

Old staircase, new treads

The concrete staircase was cold and loud. Instead of ripping it out, we measured every step individually and clad it in oak. The family could stay in the house throughout.

WoodOak, 20 mm overlay
TaskClad a concrete staircase
Build time4 days, 2025
Steep wooden staircase up to the attic
Musterdorf-Ort

Staircase to a converted attic

There used to be a pull-down ladder, and now there’s a proper staircase. Because there was hardly any floor space, the treads are staggered, so you always have to start with the same foot. It takes some getting used to, and we told the owners that before they ordered.

WoodSpruce, lacquered
TaskSpace-saving staircase, 11 steps
Build time2 weeks, 2023
Front doors

Doors that stand up to winter

A solid wood door is a part of the house that lives out in the weather. It has to seal tightly, lock securely and be adjustable after a few years. We build them with triple seals and current hardware, even when they’re meant to look old from the outside.

Front door made of vertical boards
Musterwald

Front door in larch

The old door barely closed in winter. The new one has triple seals and security hardware, but with its vertical boarding it looks just like it always did.

WoodLarch from the valley
TaskReplacement, same size as the old door
Build time4 weeks, 2025
Wooden door on an outbuilding
Musterching

Farmyard door after an old original

All that was left of the original was a photo from the sixties. We took the proportions from it and built it new. The fittings came from the blacksmith in the next village.

WoodSpruce, hand-forged fittings
TaskRebuilt from a photo
Build time3 weeks, 2024
Wooden front door in a covered entrance
Musterham

Front door with a fixed side panel

The hallway was dark, so the door got a narrow glass panel next to it. Triple glazing, the wood painted opaque on the outside and oiled on the inside. After two years we adjusted the door leaf once, which is part of having a solid wood door.

WoodOak, lacquered outside
TaskDoor with side panel
Build time5 weeks, 2023
Shop fittings

Counters, shelving, reception desks

With commercial jobs, what matters most is that everything is easy to clean and doesn’t look worn after five years. We usually fit at the weekend or at night, so the business can keep running.

Counter in light wood with a till
Musterdorfen

Counter for a café

Six meters with a chilled display case, till and storage. Front in ash, work surfaces in linoleum, because it gets cleaned every day. Fitted over one weekend.

WoodAsh and linoleum
Task6 m counter with chilled display
Build time5 weeks, 2024
Shelving for a farm shop
Musterstätt

Fit-out for a farm shop

Shelving, a sales table and a refrigerated wall for a farm. It could be sturdy and was allowed to look like it came from a workshop. The shelves can be moved around.

WoodSpruce and oak
TaskShelving, table, refrigerated wall
Build time6 weeks, 2025
Reception desk for a practice
Musterdorf

Reception for a dental practice

The desk had to fit two workstations and still be low enough at one point for wheelchair users. That’s why it’s built on two levels. The surfaces are linoleum, because everything in the practice gets disinfected every day.

WoodMaple and linoleum
TaskDesk, two heights
Build time4 weeks, 2024
To be honest

What we don’t do

It saves both of us time to have this on the table from the start. For these things we say no, and if we know one, we’ll give you the name of a business that does it better.

  • No mass production. We don’t build furniture in series and we don’t deliver catalog kitchens for self-assembly. Every piece is drawn and built for one particular room, and fitted on site. If you’re after a standard kitchen, a furniture store will be cheaper.
  • No windows. Window making is a trade of its own, with its own machines, testing and sealing systems. We build front doors, but we deliberately don’t do windows.
  • No floor laying. We leave parquet and floorboards to the floor layer. We’re happy to coordinate with them, though, so the wood tone and transitions match your furniture.
  • No simple furniture assembly. Putting together a bought wardrobe out of the box isn’t our job. Repairs and restoration are, though, even on furniture we didn’t make.
  • No jobs that don’t fit the budget. If what you have in mind and what you can spend are far apart, we’ll say so in the first conversation, not in the quote.
Why there are no prices for each project here Every piece has its own dimensions, its own wood and its own site. A figure from someone else’s project would be off for yours and send you in the wrong direction. What we can say is this. A built-in cupboard starts at around 2,400 euros, a staircase at around 6,000 euros, a kitchen at around 18,000 euros without appliances. The fixed price comes after we’ve measured up, in writing and with drawings.
Next step

Anything here similar to what you have in mind?

Then write us a couple of sentences about it and attach a phone photo of the room. We’ll get back to you within two working days and tell you whether and when we can build it.